Journal of Civil, Construction and Environmental Engineering

| Peer-Reviewed |

Application of BIM Technology in the Drawing Deepening Stage of China Port Museum

Received: 05 June 2018    Accepted: 06 July 2018    Published: 01 August 2018
Views:       Downloads:

Share This Article

Abstract

Combined with the project of China Port Museum, the Paper has mainly introduced the application of BIM technology in the stage of deepening design of complex architecture projects. Through the three-dimensional model, it can quickly find and solve the contradictions and design mistakes in the drawings, having perfected the structure system, optimized the details, improved the efficiency and accuracy of the project’s deepening design and guaranteed the correctness of the subsequent component processing and the smooth progress of site installation.

DOI 10.11648/j.jccee.20180303.12
Published in Journal of Civil, Construction and Environmental Engineering (Volume 3, Issue 3, June 2018)
Page(s) 53-63
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2024. Published by Science Publishing Group

Keywords

Information, Bionic Architecture, Modeling, Building Information Modeling (BIM), Application

References
[1] Code for Construction of Steel Structures: GB50755-2012 [S] Beijing: China Architecture & Building Press, 2012.
[2] Research Bureau of Architectural Science of Ministry of Heavy Industry, Research Institute of Construction of Ministry of Heavy Industry. Code for Acceptance of Construction Quality of Steel Structures: GB 50205-2001 (S). Beijing: China Planning Press, 2002.
[3] Zhang Jianhua, Liu Qiang and Zhang Mi, et al. Research of Owner Dominated BIM Application in Shanghai International Financial Center Project [J]. Construction Technology, 2015. 44 (6): 29-34.
[4] Liu Zhansheng, Ma Jinshu and Wei Qixing, et al. Applied Research of BIM Technology on Construction Management of Xuzhou Olympic Sports Center Stadium [J]. Construction Technology, 2015. 44 (6): 35-39.
[5] Zhao Xuefeng, Yao Aijun and Liu Dongming, et al. Application of BIM Technology in China Zun Tower Foundation Engineering [J]. Construction Technology, 2015, 44 (6): 49-53.
[6] He Jianjun, Qian Manzu and Chen Xinxi, et al. BIM Technology Application of Working Surface Division in China Expo Exhibition Complex Project [J]. Construction Technology, 2015, 44(6): 46-48.
[7] Dong Litao, Xu Hantao and Cao Le, et al. BIM Application in The Construction of Stiff Columns of WuHan Greenland Center [J]. Joumal of Information Technology in Civil Engineering and Architcture, 2015, 7(4):41-43
[8] Li Xiangjin, Xu Jun, et al. Construction Project Information Management based on BIM Model [J]. Joumal of Information Technology In Civil Engineering and Architcture, 2015, 7(6): 83-86.
[9] Chen Jiajia, Zhu Yan, et al. Application of BIM Technology in TianJin YongJi Garden II Phase [J]. Joumal of Information Technology In Civil Engineering and Architcture, 2015, 7(6):91-95.
[10] Jiao Ke, Yang Yuanfeng and Zhou Kaixuan, et al. Study on Whole Process of Structure Design Method based on BIM [J]. Joumal of Information Technology In Civil Engineering and Architcture, 2015, 7(5):1-7.
[11] Wang Yong, Li Jiulin and Zhang Jianping, et al. Research on Management Mechnaisim of BIM Model in Building Collaborative Design [J]. Joumal of Information Technology In Civil Engineering and Architcture, 2014, 6 (6):64-69.
[12] Chen Shun. Application of BIM Technique in Wu Han Center Project [J] Architecture Technology, 2014, 45 (12): 1127-1130.
Author Information
  • Ningbo Construction Co. Ltd., Ningbo, China

  • Ningbo Construction Co. Ltd., Ningbo, China

Cite This Article
  • APA Style

    Wang Zhanliang, Tian Xiugang. (2018). Application of BIM Technology in the Drawing Deepening Stage of China Port Museum. Journal of Civil, Construction and Environmental Engineering, 3(3), 53-63. https://doi.org/10.11648/j.jccee.20180303.12

    Copy | Download

    ACS Style

    Wang Zhanliang; Tian Xiugang. Application of BIM Technology in the Drawing Deepening Stage of China Port Museum. J. Civ. Constr. Environ. Eng. 2018, 3(3), 53-63. doi: 10.11648/j.jccee.20180303.12

    Copy | Download

    AMA Style

    Wang Zhanliang, Tian Xiugang. Application of BIM Technology in the Drawing Deepening Stage of China Port Museum. J Civ Constr Environ Eng. 2018;3(3):53-63. doi: 10.11648/j.jccee.20180303.12

    Copy | Download

  • @article{10.11648/j.jccee.20180303.12,
      author = {Wang Zhanliang and Tian Xiugang},
      title = {Application of BIM Technology in the Drawing Deepening Stage of China Port Museum},
      journal = {Journal of Civil, Construction and Environmental Engineering},
      volume = {3},
      number = {3},
      pages = {53-63},
      doi = {10.11648/j.jccee.20180303.12},
      url = {https://doi.org/10.11648/j.jccee.20180303.12},
      eprint = {https://download.sciencepg.com/pdf/10.11648.j.jccee.20180303.12},
      abstract = {Combined with the project of China Port Museum, the Paper has mainly introduced the application of BIM technology in the stage of deepening design of complex architecture projects. Through the three-dimensional model, it can quickly find and solve the contradictions and design mistakes in the drawings, having perfected the structure system, optimized the details, improved the efficiency and accuracy of the project’s deepening design and guaranteed the correctness of the subsequent component processing and the smooth progress of site installation.},
     year = {2018}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Application of BIM Technology in the Drawing Deepening Stage of China Port Museum
    AU  - Wang Zhanliang
    AU  - Tian Xiugang
    Y1  - 2018/08/01
    PY  - 2018
    N1  - https://doi.org/10.11648/j.jccee.20180303.12
    DO  - 10.11648/j.jccee.20180303.12
    T2  - Journal of Civil, Construction and Environmental Engineering
    JF  - Journal of Civil, Construction and Environmental Engineering
    JO  - Journal of Civil, Construction and Environmental Engineering
    SP  - 53
    EP  - 63
    PB  - Science Publishing Group
    SN  - 2637-3890
    UR  - https://doi.org/10.11648/j.jccee.20180303.12
    AB  - Combined with the project of China Port Museum, the Paper has mainly introduced the application of BIM technology in the stage of deepening design of complex architecture projects. Through the three-dimensional model, it can quickly find and solve the contradictions and design mistakes in the drawings, having perfected the structure system, optimized the details, improved the efficiency and accuracy of the project’s deepening design and guaranteed the correctness of the subsequent component processing and the smooth progress of site installation.
    VL  - 3
    IS  - 3
    ER  - 

    Copy | Download

  • Sections