Science Research

| Peer-Reviewed |

Logistic Simulation of the Bogie Bracket Welding Production Line Using the RaLC Software

Received: 18 May 2014    Accepted: 05 June 2014    Published: 20 June 2014
Views:       Downloads:

Share This Article

Abstract

Based on the process design and the production program, the 3D simulation model of the bogie bracket welding production line is built by RaLC. This model was built for the practical problem of the manufacturing logistics design of a bulldozer company joint workshop in Shanghai. The modeling and simulation technique is applied in this process. Then the bogie bracket welding production line is simulated and designed by RaLC. This study puts forward an improvement plan for the bottleneck process in the production line through the analysis of the simulation results, which achieves the optimization design goal of the production line.

DOI 10.11648/j.sr.20140203.12
Published in Science Research (Volume 2, Issue 3, June 2014)
Page(s) 38-42
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2024. Published by Science Publishing Group

Keywords

Production Line, Modeling, Simulation, Optimization

References
[1] Zhang Weide, Yan Hongseng, Xu Cheng. Simulation and Application of production line Based on Flexsim[J]. Industrial control computer, 2005, 18(9): 46-47.
[2] Dong Na, Liu Long, Xu Kelin etc. Simulation and Optimization of the facial mask production line Based on Flexsim[J]. Precise Manufacturing & Automation, 2009, (1): 26-28.
[3] Zheng Shunshui. Study on Techniques Simulation of Pro-duction System[J]. Advanced Manufacturing Technology, 2004, 23(4): 22-23.
[4] Li Hua. Modeling and Simulation of Car welding Process Based on eM-Plant[D]. Southwest jiaotong University, 2010.
Author Information
  • College of Automobile Engineering, Shanghai University of Engineering Science, Shanghai, China

  • College of Automobile Engineering, Shanghai University of Engineering Science, Shanghai, China

  • College of Automobile Engineering, Shanghai University of Engineering Science, Shanghai, China

  • College of Automobile Engineering, Shanghai University of Engineering Science, Shanghai, China

Cite This Article
  • APA Style

    Geng Hai-yang, Luo Yi-ping, Ren Hong-juan, Xu Biao. (2014). Logistic Simulation of the Bogie Bracket Welding Production Line Using the RaLC Software. Science Research, 2(3), 38-42. https://doi.org/10.11648/j.sr.20140203.12

    Copy | Download

    ACS Style

    Geng Hai-yang; Luo Yi-ping; Ren Hong-juan; Xu Biao. Logistic Simulation of the Bogie Bracket Welding Production Line Using the RaLC Software. Sci. Res. 2014, 2(3), 38-42. doi: 10.11648/j.sr.20140203.12

    Copy | Download

    AMA Style

    Geng Hai-yang, Luo Yi-ping, Ren Hong-juan, Xu Biao. Logistic Simulation of the Bogie Bracket Welding Production Line Using the RaLC Software. Sci Res. 2014;2(3):38-42. doi: 10.11648/j.sr.20140203.12

    Copy | Download

  • @article{10.11648/j.sr.20140203.12,
      author = {Geng Hai-yang and Luo Yi-ping and Ren Hong-juan and Xu Biao},
      title = {Logistic Simulation of the Bogie Bracket Welding Production Line Using the RaLC Software},
      journal = {Science Research},
      volume = {2},
      number = {3},
      pages = {38-42},
      doi = {10.11648/j.sr.20140203.12},
      url = {https://doi.org/10.11648/j.sr.20140203.12},
      eprint = {https://download.sciencepg.com/pdf/10.11648.j.sr.20140203.12},
      abstract = {Based on the process design and the production program, the 3D simulation model of the bogie bracket welding production line is built by RaLC. This model was built for the practical problem of the manufacturing logistics design of a bulldozer company joint workshop in Shanghai. The modeling and simulation technique is applied in this process. Then the bogie bracket welding production line is simulated and designed by RaLC. This study puts forward an improvement plan for the bottleneck process in the production line through the analysis of the simulation results, which achieves the optimization design goal of the production line.},
     year = {2014}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Logistic Simulation of the Bogie Bracket Welding Production Line Using the RaLC Software
    AU  - Geng Hai-yang
    AU  - Luo Yi-ping
    AU  - Ren Hong-juan
    AU  - Xu Biao
    Y1  - 2014/06/20
    PY  - 2014
    N1  - https://doi.org/10.11648/j.sr.20140203.12
    DO  - 10.11648/j.sr.20140203.12
    T2  - Science Research
    JF  - Science Research
    JO  - Science Research
    SP  - 38
    EP  - 42
    PB  - Science Publishing Group
    SN  - 2329-0927
    UR  - https://doi.org/10.11648/j.sr.20140203.12
    AB  - Based on the process design and the production program, the 3D simulation model of the bogie bracket welding production line is built by RaLC. This model was built for the practical problem of the manufacturing logistics design of a bulldozer company joint workshop in Shanghai. The modeling and simulation technique is applied in this process. Then the bogie bracket welding production line is simulated and designed by RaLC. This study puts forward an improvement plan for the bottleneck process in the production line through the analysis of the simulation results, which achieves the optimization design goal of the production line.
    VL  - 2
    IS  - 3
    ER  - 

    Copy | Download

  • Sections