Maintenance costs have risen steadily over recent years in proportion to total investment in thermal power stations, however lack of regular maintenance can result in serious equipment failure with catastrophic consequences. In general, the Nigerian power generation capability has nosedived to an abysmal level, particularly at the generation stations due to poor maintenance culture. This paper evaluated maintainability of steam and gas turbines components in a thermal power station. Data were obtained from a thermal power station in Nigeria; these raw data were extracted from the operation department, which represents records of plant generation capabilities as well as other inherent daily conditions that will enhance the success of this study. Various maintainability measures were used in analyzing the data, the study implemented log normal distribution considering that most turbines fails due to fatigue and other phenomenon that are caused by ageing or wear resulting in failure rates that increase with time. The estimated mean time to failure of turbine 2 reduced from 35744.5 hours to 33643.8 hours after the use of a condition based preventive maintenance policy. Mean Preventive Maintenance Time (MPMT) for Economizer Inlet non Return Valve and its effect on steam turbine 1 ranges from 77144hrs to 4296hrs for gas turbine 2. The station overall mean maintenance time showed that steam turbine 1 has a maximum hours (77144hrs), while its is minimum for gas turbine2 (4296 hrs). MPMT of sub-equipment is maximum up to 48717 hrs on Gear defect/Hood diaphragm for steam turbine 2; also maximum for the Economizer Inlet non Return Valve, while this was minimum about 48708 hrs for the water pump. For gas turbine 2 MPMT hours for seal leakages and air filters have a maximum value of about 4295.5 hrs, while it is very low on other equipment. The equipment maximum corrective maintenance time (MCMT) of various turbines is higher for steam turbine 2 (10.04 hrs), while minimum for gas turbine 2 (10.00 hrs). Conclusively, planned maintenance tasks can reduce the number of unplanned or emergency trips of these turbines.

Published in American Journal of Mechanical and Industrial Engineering (Volume 2, Issue 2)
DOI 10.11648/j.ajmie.20170202.13
Page(s) 72-80
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.

Copyright

Copyright © The Author(s), 2024. Published by Science Publishing Group

Keywords

Maintainability, Steam Turbine, Gas Turbine, Power Station, Lognormal Distribution

References
[1] Raje D. V, Olaniya, R. S., Wakhare, P. D and Deshpande A. W. Availability assessment of two unit stand-by pumping system. Reliability Engineering and System safety. 2000. 68: 269-274.
[2] Gupta, S. Tewari, P. C. and Sharma A. K. Reliability and availability analysis of the ash handling unit of a steam thermal power plant. South African Journal of Industrial Engineering. 2009. 20 (1): 147-158.
[3] Shikha J. Study of industrial systems using supplementary variable technique. Master of Science these. School of Mathematics and Computer Applications (SMCA), Thapar University, Patiala. 2012.
[4] Subramani A and Dewhurst, P. Efficient design for service considerations. Manufacturing Review. 1993. 6 (1): 40-47.
[5] Nahlah M. A. M. N. Measuring Maintainability Index of a Software Depending on Line of Code Only. IOSR Journal of Computer Engineering (IOSR-JCE). 2014. 16 (2): 64-69.
[6] Zahir A. H. H. Reliability Models of Maintained Systems. Journal of Babylon University/Pure and Applied Sciences. 2013. 6 (21).
[7] Desai A and Mital A. Improving maintainability of products through the adoption of a comprehensive design for maintainability method. International Journal of Industrial Engineering, 2010. 17 (2): 103-114.
[8] Teodor V. and Adina B. Rreliability and maintainability of electric cable machinery. Annals of Faculty Engineering Hunedoara– International Journal of Engineering.Tome XIV - Fascicule 2. 2016.
[9] Ding Y. Product Maintainability Design Method and Support Tool Based on Feature Model. J. Software Engineering & Applications. 2009. 2: 165-172.
[10] Sulaiman, M. A. Effect of Planned Preventive Maintenance Application on the Performance of Egbin Thermal Power Station. Journal of Energy Technologies and Policy. 2015. 5 (1): 48-52.
[11] Adeoye OS, Bamisaye AJ (2016) Performance Evaluation and Analysis of Omotoso Power Plant 2016 in Nigeria. Innov Ener Res 5: 134. doi: 10.4172/ier.1000134.
[12] Bezerra CI, Monteiro JM, Andrade R, Rocha LS. Analyzing the Feature Models Maintainability over their Evolution Process: An Exploratory Study. InProceedings of the Tenth International Workshop on Variability Modelling of Software-intensive Systems 2016 Jan 27 (pp. 17-24). ACM.
[13] Jha, Mrs Rekha, F. Ansari, and U. K. Dey. reliability and maintainability studies on electrical drives with particular reference to capital intensive heavy coal mining machineries"International Journal of Engineering Research & Management Technology. 2016 3 (4).
[14] Zdravko N. Milovanovic, Aleksandar N. Milasinovic, Darko M. Knezevic, Jovan B. Skundric, Svetlana R. Dumonjic-Milovanovic, Evaluation and Monitoring of Condition of Turbo Generator on the Example of Thermal Power Plant Ugljevik 1x300 MW, American Journal of Mechanical and Industrial Engineering. Vol. 1, No. 3, 2016, pp. 50-57. doi: 10.11648/j.ajmie.20160103.13.
[15] Lu Z, Zhou J, Li N. Maintainability fuzzy evaluation based on maintenance task virtual simulation for aircraft system. Eksploatacja i Niezawodność. 2015; 17 (4).
[16] Mohamed Adel Sheta, Mohamed Zaki, Kamel Abd El Salam El Hadad and Aboelseoud H M.. Performance and Maintainability Evaluation of Anti-Spyware System. International Journal of Computer Applications 150 (4): 31-39, September 2016. BibTeX.
[17] Isono K, Kubo S, Chikazawa Y, Dozaki K, Oya T, Yui M. Studies on Maintainability and Repairability for Japan Sodium-Cooled Fast Reactor (JSFR). In2014 22nd International Conference on Nuclear Engineering 2014 Jul 7 (pp. V003T05A007-V003T05A007). American Society of Mechanical Engineers.
[18] Hoffner J, Lyell K, Jackson J, Stibrich S, Whittier J, Campbell R, Krick D, Dart B. Creating a balance of cost, reliability, and maintainability for utility-scale PV power plants. In2013 IEEE 39th Photovoltaic Specialists Conference (PVSC) 2013 Jun 16 (pp. 2373-2375). IEEE.
[19] Mohebbi B, Khayambashi B, Cheshmberah M. Maximum Maintainability of Complex Systems via Modulation Based on DSM and Module Layout Case Study: Laser Range Finder. International Journal of Engineering Science (2008-4870). 2015 Sep 15; 26 (4).
[20] Tian Z. and Liao H. Condition based maintenance optimization for multi-component systems using proportional hazards model, Reliability Engineering and System Safety 96 (2011) pp 581–589.
[21] Kumar S. Reliability, availability and maintainability analysis of a process industry: a state of art review. International Journal of Mathematical Sciences, Technology and Humanities 117 (2014) 1253–1267.
[22] Peng S, Vayenas N. Maintainability Analysis of Underground Mining Equipment Using Genetic Algorithms: Case Studies with an LHD Vehicle. Journal of Mining. 2014 Feb 19; 2014.
[23] Atikpakpa, A. A., Okafor, C. E. & Okonkwo, U. C. Failure and reliability evaluation of turbines used in Nigerian thermal plant. Journal of Science, Technology and Environment Informatics, 04, no. 01 (2016): 280-292. DOI: 10.18801/jstei.040116.31.
[24] F. Corvaro, G. Giacchetta, B. Marchetti, M. Recanati, Reliability, Availability, Maintainability (RAM) study, on reciprocating compressors API 618, Petroleum (2016), doi: 10.1016/ j.petlm.2016.09.002.
[25] Wu WF, Lin SR, You JS. Risk-based inspection and maintenance in process plants and their practices in Taiwan. Journal of the Chinese Institute of Engineers. 2016 Mar 18: 1-2.
[26] Govil A. K., Reliability Engineering, TaTaMc - Graw Hill publishing company Ltd., New Delhi, India. 1983.
[27] Srinath L. S. Concepts in Reliability Engineering “East –West press private Ltd. 1985.
[28] Klaas B. and Jack C. L. System Reliability Concepts and Applications", VSSD, ISBN 90-71301-68-0, Netherlands. http://www.vssd.nl/hlf/e003.htm. 2006.
[29] Samanta B., Sarkar B., Mukherjee S. K. Reliability modelling and performance analyses of an LHD system in mining. Journal of the South African Institute of Mining and Metallurgy. 2004. 1-8.
[30] Rohit P., Satyadhar J., Parag P. and Sumant K. Modeling And Reliability Analysis Of Cnt And Mems Based Wireless Sensor Network. Journal of Mathematics and Technology: 2010. 2078-0257.
[31] Tang Y. Extended Weibull Distributions In Reliability Engineering, A Thesis, National University Of Singapore. 2004.
[32] Dewangan, D. N., Jha, M. K., and Banjare Y. P. Reliability Investigation of Steam Turbine Used In Thermal Power Plant. International Journal of Innovative Research in Science, Engineering and Technology. 2014. 3 (7): 14915-14923.
[33] Kusiak A and Lee G. H. Design of Parts and Manufacturing Systems for Reliability and Maintainability. International Journal of Advanced Manufacturing Technology. 1997. 13: 67-76.
[34] Dhillon B. and Reiche, H. Reliability and Maintainability Management, Van Nostrand Reinhold, New York. 1985.
[35] Gupta A. K. Reliability, Maintenance and Safety Engineering, ISBN- 978- 81-318-0521-3. 2009.
[36] Muralidharan, K. and Syamsundar A. Statistical methods for quality, reliability and maintainability. PHI Learning Pvt. Ltd. India. 2012.
[37] Kececioglu, D. Reliability Engineering Handbook, Prentice Hall, Inc., Englewood Cliffs, New Jersey, Vol. 1. 1991.
Cite This Article
  • APA Style

    Christian Emeka Okafor, Augustine Alexander Atikpakpa, Ugochukwu Chuka Okonkwo, Ekerikevwe Kennedy Irikefe. (2017). Maintainability Evaluation of Steam and Gas Turbine Components in a Thermal Power Station. American Journal of Mechanical and Industrial Engineering, 2(2), 72-80. https://doi.org/10.11648/j.ajmie.20170202.13

    Copy | Download

    ACS Style

    Christian Emeka Okafor; Augustine Alexander Atikpakpa; Ugochukwu Chuka Okonkwo; Ekerikevwe Kennedy Irikefe. Maintainability Evaluation of Steam and Gas Turbine Components in a Thermal Power Station. Am. J. Mech. Ind. Eng. 2017, 2(2), 72-80. doi: 10.11648/j.ajmie.20170202.13

    Copy | Download

    AMA Style

    Christian Emeka Okafor, Augustine Alexander Atikpakpa, Ugochukwu Chuka Okonkwo, Ekerikevwe Kennedy Irikefe. Maintainability Evaluation of Steam and Gas Turbine Components in a Thermal Power Station. Am J Mech Ind Eng. 2017;2(2):72-80. doi: 10.11648/j.ajmie.20170202.13

    Copy | Download

  • @article{10.11648/j.ajmie.20170202.13,
      author = {Christian Emeka Okafor and Augustine Alexander Atikpakpa and Ugochukwu Chuka Okonkwo and Ekerikevwe Kennedy Irikefe},
      title = {Maintainability Evaluation of Steam and Gas Turbine Components in a Thermal Power Station},
      journal = {American Journal of Mechanical and Industrial Engineering},
      volume = {2},
      number = {2},
      pages = {72-80},
      doi = {10.11648/j.ajmie.20170202.13},
      url = {https://doi.org/10.11648/j.ajmie.20170202.13},
      eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.ajmie.20170202.13},
      abstract = {Maintenance costs have risen steadily over recent years in proportion to total investment in thermal power stations, however lack of regular maintenance can result in serious equipment failure with catastrophic consequences. In general, the Nigerian power generation capability has nosedived to an abysmal level, particularly at the generation stations due to poor maintenance culture. This paper evaluated maintainability of steam and gas turbines components in a thermal power station. Data were obtained from a thermal power station in Nigeria; these raw data were extracted from the operation department, which represents records of plant generation capabilities as well as other inherent daily conditions that will enhance the success of this study. Various maintainability measures were used in analyzing the data, the study implemented log normal distribution considering that most turbines fails due to fatigue and other phenomenon that are caused by ageing or wear resulting in failure rates that increase with time. The estimated mean time to failure of turbine 2 reduced from 35744.5 hours to 33643.8 hours after the use of a condition based preventive maintenance policy. Mean Preventive Maintenance Time (MPMT) for Economizer Inlet non Return Valve and its effect on steam turbine 1 ranges from 77144hrs to 4296hrs for gas turbine 2. The station overall mean maintenance time showed that steam turbine 1 has a maximum hours (77144hrs), while its is minimum for gas turbine2 (4296 hrs). MPMT of sub-equipment is maximum up to 48717 hrs on Gear defect/Hood diaphragm for steam turbine 2; also maximum for the Economizer Inlet non Return Valve, while this was minimum about 48708 hrs for the water pump. For gas turbine 2 MPMT hours for seal leakages and air filters have a maximum value of about 4295.5 hrs, while it is very low on other equipment. The equipment maximum corrective maintenance time (MCMT) of various turbines is higher for steam turbine 2 (10.04 hrs), while minimum for gas turbine 2 (10.00 hrs). Conclusively, planned maintenance tasks can reduce the number of unplanned or emergency trips of these turbines.},
     year = {2017}
    }
    

    Copy | Download

  • TY  - JOUR
    T1  - Maintainability Evaluation of Steam and Gas Turbine Components in a Thermal Power Station
    AU  - Christian Emeka Okafor
    AU  - Augustine Alexander Atikpakpa
    AU  - Ugochukwu Chuka Okonkwo
    AU  - Ekerikevwe Kennedy Irikefe
    Y1  - 2017/01/20
    PY  - 2017
    N1  - https://doi.org/10.11648/j.ajmie.20170202.13
    DO  - 10.11648/j.ajmie.20170202.13
    T2  - American Journal of Mechanical and Industrial Engineering
    JF  - American Journal of Mechanical and Industrial Engineering
    JO  - American Journal of Mechanical and Industrial Engineering
    SP  - 72
    EP  - 80
    PB  - Science Publishing Group
    SN  - 2575-6060
    UR  - https://doi.org/10.11648/j.ajmie.20170202.13
    AB  - Maintenance costs have risen steadily over recent years in proportion to total investment in thermal power stations, however lack of regular maintenance can result in serious equipment failure with catastrophic consequences. In general, the Nigerian power generation capability has nosedived to an abysmal level, particularly at the generation stations due to poor maintenance culture. This paper evaluated maintainability of steam and gas turbines components in a thermal power station. Data were obtained from a thermal power station in Nigeria; these raw data were extracted from the operation department, which represents records of plant generation capabilities as well as other inherent daily conditions that will enhance the success of this study. Various maintainability measures were used in analyzing the data, the study implemented log normal distribution considering that most turbines fails due to fatigue and other phenomenon that are caused by ageing or wear resulting in failure rates that increase with time. The estimated mean time to failure of turbine 2 reduced from 35744.5 hours to 33643.8 hours after the use of a condition based preventive maintenance policy. Mean Preventive Maintenance Time (MPMT) for Economizer Inlet non Return Valve and its effect on steam turbine 1 ranges from 77144hrs to 4296hrs for gas turbine 2. The station overall mean maintenance time showed that steam turbine 1 has a maximum hours (77144hrs), while its is minimum for gas turbine2 (4296 hrs). MPMT of sub-equipment is maximum up to 48717 hrs on Gear defect/Hood diaphragm for steam turbine 2; also maximum for the Economizer Inlet non Return Valve, while this was minimum about 48708 hrs for the water pump. For gas turbine 2 MPMT hours for seal leakages and air filters have a maximum value of about 4295.5 hrs, while it is very low on other equipment. The equipment maximum corrective maintenance time (MCMT) of various turbines is higher for steam turbine 2 (10.04 hrs), while minimum for gas turbine 2 (10.00 hrs). Conclusively, planned maintenance tasks can reduce the number of unplanned or emergency trips of these turbines.
    VL  - 2
    IS  - 2
    ER  - 

    Copy | Download

Author Information
  • Department of Mechanical Engineering, Nnamdi Azikiwe University, Awka, Nigeria

  • Department of Mechanical Engineering, Delta State Polytechnic, Otefe-Oghara, Nigeria

  • Department of Mechanical Engineering, Nnamdi Azikiwe University, Awka, Nigeria

  • Department of Statistic, Delta State Polytechnic, Otefe-Oghara, Nigeria

  • Sections